Estimating Tip- CCC/MOTOR – Testing PPE Equipment
DEG Inquiry
19876 addresses a question regarding
testing PPE equipment.
The end-user asks:
“Is time for “High Voltage PPE
Prepare, Test, Put Away” included with “High voltage system
deactivate/activate” This step is not listed in any OEM procedure we have
seen, but is always listed within any HV training for the manufacture. Based on
910.137 – Electrical Protective Equipment – Glove must be tested daily, or
before use. Then the OEM procedure can begin”
MOTOR
response:
“•
Gathering tools and equipment to complete a procedure is included in the
estimated work time provided.
• Testing equipment and set up of equipment is not an included operation.”