Estimate Tip – CCC – Assigning component classification designation
CCC Users can quickly assign Mechanical (M) or Structural (S) rate classifications to the replacement parts by following these steps: Right Click on the specific
CCC Users can quickly assign Mechanical (M) or Structural (S) rate classifications to the replacement parts by following these steps: Right Click on the specific
DEG Inquiry 17882 confirms what steps are considered during “Disable & Enable Air Bag System.” According to Mitchell Cloud Estimating, “the labor allowance for Disable
When performing R&R (Remove and Replace) or R&I (Remove and Install) procedures in Solera Qapter, users can quickly include necessary “Additional Labor Operations” directly during
Replacement parts may require solvent compatibility testing prior to refinishing to ensure your products don’t react with factory coatings. Labor and materials to test, strip,
CCC GTE has made updates to its 11-25 REV adding “Air Conditioning System – Recharge R1234YF”. CCC users can now confirm included and not included
Use the integrated markup tools to highlight specific damage or repair areas directly on your photos. When you save these annotations, Qapter automatically preserves the
DEG Inquiry 40336 confirms published refinish times on bumpers may not include masking the backside of bumper in the radar zone. Where we have been
In the latest CCC GTE Rev 11-25 update, MOTOR has updated NOT INCLUDED operations adding “Checking tire runout” and “Creating Target / assembling targets”
Solera Qapter users can reference information about Chipguard application in Solera DBRM page 139 section 4-4 Refinish Guidelines “The application of chipguard material to the
DEG Inquiry 23622 verifies that Mitchell includes the refinish time for the fuel door with the quarter panel, and the refinish time for tow cap