Estimate Tip – Solera Qapter – Administrative Labor
Recent DEG Inquiry 31575 provides feedback from a Solera Qapter request for review (RFR). “any time spent utilizing Qapter to complete an estimate is not
Recent DEG Inquiry 31575 provides feedback from a Solera Qapter request for review (RFR). “any time spent utilizing Qapter to complete an estimate is not
When replacing a quarter panel using Mitchell Cloud Estimating (MCE), end-users may find additional NOT INCLUDED labor operations by expanding the “Labor Only Operations” section
Recent changes to CCC GTE estimate work time premise state “Reported times include one test fit of a component and normal adjustment procedures within the range of
Recent DEG Inquiry 35654 provides feedback from Solera Qapter (Audatex) regarding door O/H operation(s). “REAR DOOR O/H operation, designed for removing and installing parts for
Recent DEG Inquiry 35578 provides feedback from Mitchell regarding classification of frame for replacement. “Frame R&R is a unique operation where one labor time represents multiple individual operations. The
CCC/MOTOR Guides have updated “Basic Color Coat Application” Not Included operation “Flash / wait time between material applications” Flash and Cure consideration would be an
Solera Qapter has made recent updates (November 2023) to its Database Reference Manual(DBRM), specifically on page 140, section 4-4 Refinish Guidelines, regarding “Blending”. Access an
An estimating database for Rivian R1T is currently available in Mitchell Cloud Estimating. CCC and Audatex users can produce repair plans utilizing manual entries for
Estimating Tip – CCC- Locating the MOTOR GTE and RACED Guide in CCCone Web CCCone web users can easily access and view both the MOTOR
DEG Inquiry 31868, Mitchell provides an explanation of refinish labor differences between a full door shell replacement vs outer panel (door skin) replacement, when “add