Estimate Tip – Mitchell – Add to transfer glass workflow
Mitchell Cloud Estimating (MCE) users should follow the correct workflow when transferring glass from the original damaged liftgate to a new replacement liftgate. DO select
Mitchell Cloud Estimating (MCE) users should follow the correct workflow when transferring glass from the original damaged liftgate to a new replacement liftgate. DO select
Recent DEG Inquiry 38332 provides feedback on capturing quarter panel “exterior, lock pillar & edging” refinish operations. “The exterior surface estimated refinish time is for
Solera Qapter DBRM page 141 section 4-4 Refinish Guideline states Repaired Panel Refinish “When a repaired panel is being refinished, the estimator provides time for
Recent DEG Inquiry 23296 provide feedback on “Adjacent Panel Damage” for welded panel replacement. “Mitchell labor times represent labor tasks being performed in a collision
Recent DEG Inquiry 38189 provide feedback on “Aim Distance Sensor” for Lexus and Toyota vehicles front millimeter wave radar (mmWave). “The estimated work time includes
Solera Qapter DBRM page 145 section 4-4 Refinish Guideline states “Audatex does not include refinish labor for roof or bed underside.”
MCE users can quickly see estimate repair cost breakdown by clicking on the down arrow next to repair cost.
Qapter users can select “PANEL, BODYSIDE QTR UPR” for either refinish or blend operation when in “Quarter and Rocker Panel” section. Labor and materials to
DEG Inquiry 37947 establishes that “Second or subsequent fitment of a component to the vehicle, for any reason (including verification of dimensional accuracy or adjacent
Brackets and braces may require additional labor to apply corrosion protection and refinish to replicate the original appearance. Reference DEG Inquiry 38011 for more information.