Estimate Tip – Mitchell – Radiator Supports
Mitchell estimating users will find two separate sections in Mitchell CEG relating to “Radiator Supports” Page 5 Cooling > Radiator Support R&R Is referencing “bolt
Mitchell estimating users will find two separate sections in Mitchell CEG relating to “Radiator Supports” Page 5 Cooling > Radiator Support R&R Is referencing “bolt
Recent Updates in Solera Qapter DBRM page 44 section 4-2 labor exclusions: “Additional required operations that are taught in an OEM training environment but aren’t
An estimating database for Rivian R1T & R1S is currently available in CCC Estimating. Always consult OEM repair information and available documents for the most
When replacing front door(s) on a 2014-2023 Jeep Grand Cherokee, repairers should check the inner door shell jamb to determine if mounting holes need to
DEG Inquiry 35937 establishes that labor to set up fixtures or jigs for an EV drive train table is NOT INCLUDED “After review, assembling jigs
Mitchell cloud estimating users may experience VIN decoding issues on “fleet” vehicle models. Mitchell provides feedback on DEG Inquiry 35744 “Fleet vehicles do not decode
Recent DEG Inquiry 31575 provides feedback from a Solera Qapter request for review (RFR). “any time spent utilizing Qapter to complete an estimate is not
When replacing a quarter panel using Mitchell Cloud Estimating (MCE), end-users may find additional NOT INCLUDED labor operations by expanding the “Labor Only Operations” section
Recent changes to CCC GTE estimate work time premise state “Reported times include one test fit of a component and normal adjustment procedures within the range of
Recent DEG Inquiry 35654 provides feedback from Solera Qapter (Audatex) regarding door O/H operation(s). “REAR DOOR O/H operation, designed for removing and installing parts for