Estimate Tip – CCC/ MOTOR – Testing PPE Equipment

May 15, 2023
Danny

Estimating Tip- CCC/MOTOR – Testing PPE Equipment

DEG Inquiry 19876 addresses a question regarding testing PPE equipment.

The end-user asks:

Is time for “High Voltage PPE Prepare, Test, Put Away” included with “High voltage system deactivate/activate” This step is not listed in any OEM procedure we have seen, but is always listed within any HV training for the manufacture. Based on 910.137 – Electrical Protective Equipment – Glove must be tested daily, or before use. Then the OEM procedure can begin”

MOTOR response:

“• Gathering tools and equipment to complete a procedure is included in the estimated work time provided.