Inquiry:

11428

SubmittedStatus
2017-10-28 00:00:00 Resolved (No IP Change)

YearMakeModelBody
2017 Buick All Models

Tracking # 11428
Resolution

The included operations for blend include “Apply bonding material – if required”

For blending operations, this would constitute a wet bed material application.

Published labor allowances and formulas in the database are specific to the time that is required for the performance of that operation.

Labor allowances do not take into account the cost of any materials associated with the operation being performed.


Inquiry type Refinish Operations
Suggested Action Please clarify if Wet Bed Application and Material Cost is or is not included in the blend refinish times.