Proposed Resolution: MOTOR stated:
After review, we have determined the following:
. Straightening of parts deformed during drilling is not included and would be an “on the spot” evaluation. . According to the MOTOR Guide To Estimating, “Labor Time Premise,” Does Not Include,” “Refinishing” and “Weld Thru Primer.” . MOTOR Estimated Work Times are derived from actual procedural steps. Wait time for example, waiting for drill bit to cool is not factored into the component replacement time and cutting fluids may be employed with a cutter for lubrication and cooling. . While there is a sequence of steps in replacing the Panel Reinforcement and Front Reinforcement, there is also overlap involved as well since many of the exact same steps are required when replacing multiples of the same part. . Both the Panel Reinforcement and Front Reinforcement are unlikely to be replaced as standalone operations only. Most likely these are replaced as part of a bigger panel such as trunk floor, rear body panel, etc. The Panel Reinforcement is an included operation in Rear Floor Pan replacement. . The estimated work time of 0.7 hours applied to the Panel Reinforcement is appropriate. . The estimated work time of 0.5 hours applied to the Front Extension is appropriate. |