Estimated Release Date: Closed
Proposed Resolution: MOTOR stated:
After review, the following has been determined: After a thorough review with all analysts, the published times are appropriate. MOTOR understands the assembly statement; However, the service procedures and estimated work time development premise are performing repairs on new undamaged vehicles, using the multiple inputs including OEM procedures, real world experience, field observations, and others. MOTOR estimated work times developed consider proper care is used. MOTOR feedback: After review, a New Undamaged vehicle is a vehicle that is UNDAMAGED, before it is sold into the market. Please note: According to the MOTOR Guide To Estimating: DAMAGED OR NON-REUSABLE MOLDINGS AND FASTENERS Damaged or Non-Reusable Moldings and Fasteners: “Some moldings may be damaged or broken during normal R&I procedures. Additionally, some plastic or metal fasteners may be damaged and their ability to be reused jeopardized because of single-use design, age or exposure to the elements. Moldings, emblems and trim attached using a heat stake method are considered to be non-reusable. Caution should be taken while removing all fasteners, both metal and plastic. MOTOR recommends these factors be considered and mutually agreed upon before finalizing any repair cost estimate.” |