Recently, Repairer Driven News highlighted discussion about post calibration radar power test . Repairs that require a specific radar power test would be NOT INCLUDED in published labor times.
Always reference Included/ NOT INCLUDED operations located in CCC/MOTOR GTE Section Camera
and Sensor Aiming P- Page Procedures.