Estimate Tip – Solera Qapter (Audatex) Three-Stage Spray out & Let Down Panels

According to the Solera Qapter DBRM Section 4-4 Refinish Guidelines, three-stage refinish allows for 2 spray out/let down panels;  included as part…
image

Estimate Tip – Mitchell – Masking Glass

DEG Inquiry 38709 provides feedback from Mitchell regarding glass masking operations – sometimes referred to as “roping”  when using lift tape to…
image

Estimate Tip – CCC – Damaged or Non-Reusable Moldings and Fasteners

DEG Inquiry 38549 provides feedback from MOTOR regarding components that may be damaged during removal, even with proper care is applied. According…
image

Estimate Tip – Solera Qapter – Changing Zone Selection

Solera Qapter users can quickly change the “Zone Selection” screen by using the left and right buttons on the top left corner…
image

Estimate Tip – Mitchell – Side Body Refinish

When repair or replacement of side body panel (Quarter panels) needing refinish, additional labor may require extending basecoat / clear coat into…
image

Estimate Tip – CCC – R&I Headlights does not include Aim Lights

Recent DEG Inquiry 38543 features feedback from MOTOR that establishes “anytime the headlamp assembly is removed from the vehicle the ’Aim Headlamps’…
image

Estimate Tip – Mitchell – Refn Backside Door Outer Panel

DEG Inquiry 18059 provided feedback for second color consideration when refinishing backside & inside of outer door panel. “If the repairer needs…
image

Estimate Tip – Solera Qapter (Audatex) – Corrosion Protection

Solera Qapter DBRM page 146 Section 4-4 Refinish guidelines states “Corrosion protection is the process and materials used to prevent corrosion.” End…