Search DEG
Subscribe To Our Weekly Email
"*" indicates required fields
Search DEG
Subscribe To Our Weekly Email
"*" indicates required fields
Estimate Tip – Solera Qapter (Audatex) – Set Up and Measure NOT INCLUDED
Qapter Estimating offers users to select “Set Up and Measure” as a standalone operation from its database with an ON THE SPOT…
Estimate Tip – CCC -Quarter panel, section
CCC may identify labor to section a quarter panel. The section labor time is often different than a full panel replacement. When…
Estimate Tip – Mitchell – Addressing overlap when major adjacent panels are refinished in separate booth cycles
Estimating Tip – Mitchell – Addressing overlap, when major adjacent panels are refinished in separate booth cyclesDEG Inquiry 14489 provides feedback from…
Estimate Tip – CCC – Fastener Replacement on Service Part
DEG Inquiry 36936 provides feedback for replacement fasteners on a service part “ MOTOR does not assign estimated work times to attaching…
Estimate Tip – Solera Qapter (Audatex) – Supplement Reconciliation
Solera Qapter users can view a "Supplement Reconciliation" report by selecting the "Reports" tab, and using the drop-down menu on the pop…
Estimate Tip – CCC – Masking recessed jambs and gaps
Closing the gap between two adjacent panels so that overspray does not get on the jamb, edge, underside, or interior is included…
Estimate Tip – Mitchell – R&I Times not published for components attached with adhesive
Recent DEG Inquiry 36760 provides feedback from Mitchell regarding labor allowance for R&I is not published on components attached with adhesive in…
Estimate Tip – CCC – Bolted on Parts
Labor footnotes for various components may indicate “time is after all necessary bolt on parts are removed.” Labor procedures for a component…